8″ Strong Sleeve
8″ Strong Sleeve
$130.90
Strong Sleeve for soil gas collector matting in 8″. Strong sleeves go in form during load-bearing footer pours. Once the concrete is hardened, the foam knockouts are removed and you have a void space to put gas matting through. Strong sleeves allow for pressure field extension across footers.
Benefits:
- Higher PFE
- Less roof penetrations
- Lower ongoing maintenance costs
- Safer construction site
Applications:
- Slabs with load bearing footers
- Floors with hydronic heating
- Crawlspaces with concrete grade beams or pony wall supporsts
Code checklist
- ANSI AARST RRNC 2.0
- ANSI AARST CC-1000
- ASTM 1465-06
- IRC APPENDIX F
- LEED BD+C
Is is recommended, especially during cold weather months, that 2″ is removed from grade to allow for soil gas collector in soil with 1″ foam above. See drawings below.
Strong Sleeve Product Detail SSK08
Soil Gas Mat subslab preparation detail for FOAM
Strong Sleeve in Form CAD
Installation Video Click HERE
Placed in form for gas mat penetrations across slabs.
Description
Strong Sleeve for soil gas collector matting in 8″. Strong sleeves go in form during load-bearing footer pours. Once the concrete is hardened, the foam knockouts are removed and you have a void space to put gas matting through. Strong sleeves allow for pressure field extension across footers.
Benefits:
- Higher PFE
- Less roof penetrations
- Lower ongoing maintenance costs
- Safer construction site
Applications:
- Slabs with load bearing footers
- Floors with hydronic heating
- Crawlspaces with concrete grade beams or pony wall supporsts
Code checklist
- ANSI AARST RRNC 2.0
- ANSI AARST CC-1000
- ASTM 1465-06
- IRC APPENDIX F
- LEED BD+C
Is is recommended, especially during cold weather months, that 2″ is removed from grade to allow for soil gas collector in soil with 1″ foam above. See drawings below.
Strong Sleeve Product Detail SSK08
Soil Gas Mat subslab preparation detail for FOAM
Strong Sleeve in Form CAD
Installation Video Click HERE