Strong Sleeve for soil gas collector matting in 8″. Strong sleeves go in form during load-bearing footer pours. Once the concrete is hardened, the foam knockouts are removed and you have a void space to put gas matting through. Strong sleeves allow for pressure field extension across footers.
Strong Sleeve Pressure Field Evaluation 2025Â <— Industry first study on airflow
Benefits:
Applications:
Code checklist
Is is recommended, especially during cold weather months, that 2″ is removed from grade to allow for soil gas collector in soil with 1″ foam above. See drawings below.
Strong Sleeve Product Detail SSK08
Have friends and family enter your name at checkout for referral awards